Slowdown Lowdown

We're stuck in traffic so you don't have to be

NOTICE: Slowdown Lowdown has moved.

With the launch of our new website, we've moved Slowdown Lowdown.
Visit the new section.

Rain delays Narrows bridge repair work

Post by Rob Carson / The News Tribune on June 12, 2013 at 3:21 pm with No Comments »
June 12, 2013 3:21 pm

Pavement repair work scheduled tonight through tomorrow morning on the eastbound Tacoma Narrows bridge has been canceled because of a wet weather forecast.

The pavement work is still scheduled from 9 p.m. Thursday through 5 a.m. Friday.

During that time, crews will reduce eastbound State Route 16 to one lane across the bridge.

Tonight’s work will be rescheduled for a dry night, according to the Washington State Department of Transportation.

Leave a comment Comments
*
We welcome comments. Please keep them civil, short and to the point. ALL CAPS, spam, obscene, profane, abusive and off topic comments will be deleted. Repeat offenders will be blocked. Thanks for taking part and abiding by these simple rules.

JavaScript is required to post comments.

Follow the comments on this post with RSS 2.0