Slowdown Lowdown

We're stuck in traffic so you don't have to be

NOTICE: Slowdown Lowdown has moved.

With the launch of our new website, we've moved Slowdown Lowdown.
Visit the new section.

Prepare for overnight ramp closures at JBLM starting Monday

Post by John Henrikson / The News Tribune on Aug. 19, 2011 at 1:05 pm with No Comments »
August 19, 2011 1:05 pm

This from WSDOT. Thankfully, the work is happening overnight, so it shouldn’t add to the heavy daytime backups we’ve been seeing lately.

LAKEWOOD– A paving project that smoothes a busy stretch of Interstate 5 is underway in Lakewood and will impact access to and from Joint Base Lewis-McChord (JBLM) next week.

Drivers can expect ramp closures to and from the JBLM Main Gate located at exit 120 overnights Monday through Friday, Aug. 22 – 26, while Washington State Department of Transportation’s (WSDOT) contractor, Tucci and Sons, Inc. grind the ramps smooth.

Ramp closures are as follows:

· Monday, Aug. 22 and Tuesday, Aug. 23, the on- and off-ramps from northbound I-5 to JBLM close.

· Wednesday, Aug. 24, the ramps from both northbound and southbound I-5 to JBLM close.

· Thursday, Aug. 25 and Friday, Aug. 26, crews close the ramps to and from southbound I-5 to JBLM.

Work hours are 10 p.m. to 5 a.m.

Leave a comment Comments
*
We welcome comments. Please keep them civil, short and to the point. ALL CAPS, spam, obscene, profane, abusive and off topic comments will be deleted. Repeat offenders will be blocked. Thanks for taking part and abiding by these simple rules.

JavaScript is required to post comments.

Follow the comments on this post with RSS 2.0