Letters to the Editor

Your views in 200 words or less

ORTING: Lahar bridge needs to be scaled back

Letter by Jay Stewart, Puyallup on Oct. 31, 2011 at 3:12 pm with No Comments »
October 31, 2011 3:12 pm

Re: “Long effort to build a lahar bridge in Orting makes progress” (TNT, 10-30).

I travel the road to Orting often. One thing that I think of every time is when will they replace the old narrow bridge that is such a safety hazard near McMillin. It is a well-traveled road that is beyond overdue for this replacement.

I then read of a proposed foot bridge that may never be needed and may cost $50 million. It seems a lahar foot bridge is a very good idea, but the $50 million cost will kill the project. If they really want this idea to get done they need to scale back the project’s scope.

Instead of a concrete structure that could hold up several semi trucks, why not scale back to wood or other materials? I see pictures of wooden bridges on the East Coast that are over 100 years old that are in use today. A wooden structure would certainly be in step with Orting’s Old West theme and could be built for a fraction of the original $12.7 million budget proposed in 2003.

My point is alternatives abound for a project like this. but as usual the proposed one is a shoot-for-the-sky project that only makes the contractors wealthy and the community without something it feels it needs.

Tags:
,
Leave a comment Comments
*
We welcome comments. Please keep them civil, short and to the point. ALL CAPS, spam, obscene, profane, abusive and off topic comments will be deleted. Repeat offenders will be blocked. Thanks for taking part and abiding by these simple rules.

JavaScript is required to post comments.

Follow the comments on this post with RSS 2.0